This is the development checklist as of 2/18/2013.
  • Payload:
    • Bottom:
      • Tape GPS to transmitter
      • Tape transmitter to board
      • Tape battery to board
      • Run Straps
      • Tape board to bottom of box
      • Run antenna feedline through box
      • Attach antenna to feedline
      • Possibly shave box to accomodate antenna
    • Top:
      • Find stuffing for box
      • Balance Spot on board
      • Shave board slots
      • Tape Spot to board
      • Strap Spot to board
    • Camera:
      • Shave side area for camera slot
      • Taped transparent cover
    • Strapping:
      • Build external straps with clasps for box
      • Four point attachment for parachute and balloon
    • Testing:
      • Cold testing in cooler with dry ice
      • Camera runtime testing
  • Parachute:
    • http://www.spherachutes.com/
  • Tracking:
    • Test APRSDroid with bluetooth adapter
    • Test APRSDroid with AFSK
    • Test road tracking